TN1 Network Preparation FINAL

Search in document library
TN1 Network Preparation FINAL preview
  • Published Date Mon 31 Dec 2013
All Tags

This technical note (TN) outlines the procedure used in preparing the networks for the 2011 Wellington Transportation Strategic Model (WTSM) update and the Wellington Public Transport Model (WPTM). Unlike the 2006 WTSM update, where the previous (2001) model network was used as a base for the update, a new network has been developed for the 2011 update.

Updated March 3, 2022 at 4:41 PM